Follow the gas from the main beneath the street to the gas valve inside a domestic combi boiler. See inside the governor and gas meter, then follow the U-gauge hose as the same installation is tested under different loads. Watch what changes when the hot tap opens and the cooker’s two rear burners light.
Film chapters
Choose a chapter to jump to that point. Press Play if the film is paused.
- 00:00Governor and meter cutaways
- 00:15U-gauge inside the boiler
- 00:26From the street main to the property
- 01:24Emergency control valve and governor
- 02:34Meter connections, blanking discs and caps
- 03:47Inside the meter, display controls and meter swap
- 05:01Prepayment and the meter’s internal shut-off valve
- 06:12Standing and working pressure
- 07:26Boiler demand at part and full load
- 08:48Boiler and cooker running together
- 09:57Internal gas valve inlet
- 11:15Reporting a pressure issue
- 12:22Recap and closing
Technical references
- Institution of Gas Engineers and Managers, IGEM/G/13, Domestic supply capacity and operating pressure at the outlet of the meter, amended August 2023. Sections 5.1 and 5.2 and appendix A1 cover the high operating load, meter-outlet working pressure and reporting procedure in Great Britain.
- Health and Safety Executive, L56, Safety in the installation and use of gas systems and appliances. Regulation 14(6) of the Gas Safety (Installation and Use) Regulations 1998 identifies who may break the seal on a primary meter regulator.
- Honeywell, J42 regulator data. The spring, diaphragm and valve illustrate how the governor responds to demand.
- British Standards Institution, BS 746:2014, Specification for gas meter unions and adaptors. The film uses it for the meter connections and sealing discs.
- UK type-examination certificate for Flonidan G4S meters. The certificate identifies the 1.2-litre UniFlo measuring unit. Apator, Gas Catalogue, UG-series natural-gas characteristic, provides the basis for the simulated meter pressure loss. The integral outlet valve has no separate loss curve in this model.
- ScottishPower, SMETS2 smart gas meter guide, April 2021. The balance screen and reconnection prompts apply to this meter family. The opening credit and loss of supply at zero are conditions chosen for the film.
- Worcester Bosch, Greenstar 4000 Installation and Maintenance Instructions, document 6 720 891 161, table 21 and table 33, and Technical Bulletin 0182, Industry: Alignment with IGEM/G/13, September 2024, figure 1. The manual gives the 25 and 30 kW gas rates and the model’s internal allowance. The bulletin updates the working-pressure example for natural gas.
- Beko, KSG580 gas cooker specification. Each rear burner is rated at 2 kW. Room 85 estimates their combined gas flow at about 0.40 m³/h.
What changes when the hot tap opens?
Follow the free end of the U-gauge hose. At the meter outlet, with the boiler and cooker off, the difference between the two liquid levels gives the standing pressure. Opening the tap calls for hot water. Once the boiler flame is established and gas flows, the same gauge shows working pressure.
At the meter outlet
The governor regulates the incoming supply. As gas flows through the meter, its resistance affects the outlet reading. The dial setting and the absence of extra pressure rise when flow stops are features of the simulation.
At the boiler
The inlet below the boiler is at the far end of the installation pipework. The inlet to the gas valve inside the boiler is farther downstream. Keeping the firing rate the same lets you compare those points.
| Appliances drawing gas | Meter outlet | Inlet below boiler |
|---|---|---|
| None. Boiler and cooker off. | 22.0 | — |
| Boiler at part hot-water load. Cooker off. | 21.7 | 21.7 |
| Boiler at full hot-water load. Cooker off. | 21.7 | 21.5 |
| Boiler at full hot-water load. Two rear hob burners lit. | 21.6 | 21.5 |
The gauge rounds to the nearest tenth of a millibar. Two different test points can show the same number. The dash marks a reading omitted from this comparison.
In the premises high-load check, the boiler is the largest appliance and runs at maximum. The film’s 50% cooker load means two of the four hob burners are lit. The front burners and oven stay off. About 3.03 m³/h passes through the meter. After the tee, 2.63 m³/h goes to the boiler and about 0.40 m³/h to the hob.
With the cooker off again and the 25 kW boiler firing at full hot-water load, the internal gas valve inlet shows about 21.1 mbar in the simulation. That estimate uses data for a comparable valve. For an actual boiler, its manufacturer specifies the test point, firing condition and permitted loss.
Which readings need reporting?
If poor supply pressure is reported, or an appliance fails to reach its specified inlet pressure or heat input, IGEM/G/13 directs the engineer to check the supply. In this Great Britain example, the reading is taken at the meter outlet, with the largest appliance at maximum and the remaining appliances at half load. After one minute for the pressure to stabilise, the working range at that point is 18.5–23 mbar inclusive. An engineer reports a reading outside that range to the National Gas Emergency Service on 0800 111 999, gives a callback number and records the call reference.
Room 85 uses a low standing setting on the service pipe to open the reporting rehearsal. The report uses a separate observation at the meter outlet under the prescribed load. The rehearsal places no call.
Worcester Bosch’s revised natural-gas example starts at the lower edge of the meter-outlet working range. Suppose the meter outlet reads 18.5 mbar with the boiler firing at maximum output. If the external pipework uses the full 1 mbar allowance, the inlet below the boiler would read 17.5 mbar at the same load. The Greenstar 4000 example has a separate full-load allowance of up to 1.5 mbar between the appliance inlet and the internal gas valve inlet. Each allowance applies to the two points named.
Why can the two valves disagree?
The red handle operates the emergency control valve (ECV) upstream of the meter. The meter’s display shows the position of its own internal shut-off valve. Closing the ECV can stop the supply while the display still shows the internal valve open. In the prepayment scene, the internal valve shuts as credit runs out while the external handle stays open.
In the governor cutaway, the spring and diaphragm move the regulating valve as demand changes. The on-screen adjustment is a training control. On a real mains supply in Great Britain, only the gas transporter or someone it authorises may break the primary meter regulator seal. Physical gas pressure tests and work inside a boiler are for an appropriately qualified Gas Safe registered engineer.
Read the complete film transcript
00:00 · Governor and meter cutaways
Welcome to Room 85. Gas pressure to boiler. Look inside the governor as gas begins to flow.
Inside the meter, the mist traces the flow of invisible gas.
00:15 · U-gauge inside the boiler
See where the gauge hose ends, inside the open boiler. Where did the pressure change once the burner lit? Let's follow the gas from the street.
00:26 · From the street main to the property
The gas main runs along the street. A smaller service pipe branches from it to supply the property. Follow the underground service towards the house. Where an external service isolation valve is fitted, the network team can isolate the service there. Some properties have no such valve.
Inside, the yellow pipe rises to the red handle on the emergency control valve, or ECV. You're still on the supply side.
Tap the yellow pipe. The circle marks the selected standing pressure. Drag it up for a higher pressure, or down for a lower one. The scale runs from 15 to 75 mbar in steps of a tenth. It's the range you can explore in the simulation, including a low supply fault.
Later we'll take a different reading at the meter outlet, with appliances using gas.
01:24 · Emergency control valve and governor
Follow the pipe through the red valve. Here the handle lines up with the pipe when open and lies across it when closed. The flexible connector, sometimes called the anaconda, leads from the top of that valve to the governor.
Tap the governor. Follow the mist through the restriction. Look above it for the diaphragm and spring. When demand changes, the outlet pressure acting on the diaphragm changes too. The mechanism moves the valve to admit more or less gas. As demand stops, the valve can close against its seat.
Long press the governor in the room to bring up its pressure dial. Moving the dial sets an exercise condition. Try changing the upstream supply as well. The governor can't deliver an outlet pressure higher than the supply available to it.
The cutaway shows how the adjuster changes the force on the diaphragm spring. In Great Britain, only the gas transporter, or someone it authorises, may break the seal on the primary meter regulator.
02:34 · Meter connections, blanking discs and caps
The regulated gas now enters the left connection on top of the meter. Trace the path down through the meter and back out through the connection on the right. Look at the four brass fittings on top.
There are two examples of a sealing disc. One face is recessed. The other has a solid back, with a dark ring under the rim. The other two pieces are screw-on caps. Each joint has one of each.
Watch what happens at the inlet when the emergency control valve is open. The room prevents the flexible connector from being released. With that valve closed, the animation shows where the selected fitting seats. A disc sits within the union. A cap closes the exposed connection while the union stays clear.
Follow the second pair to the meter outlet. A blank at either location interrupts the gas path. Select the small BS 746 plaque below the meter to see the union, its seal and the size references. The shape of a loose part alone can't tell you its thread or its fit.
03:47 · Inside the meter, display controls and meter swap
Tap the lower half of the meter to see its mechanism. The flexible diaphragms divide the gas into measured volumes. The index records their total in cubic metres. Gas can be present with the mechanism stationary if every appliance is off.
Above the three red buttons, the prompts show what A, B and C do on each screen. Compare the volume index with the meter's current status. One tells you how much gas has been registered. The other can tell you about the meter's own valve.
Closing the red handle stops the supply upstream. The separate motorised valve inside the meter may still show open. Its symbol follows its own position. Try a demand at the boiler and check whether the flame appears.
Long press the lower half to swap the UniFlo for the electronic G470 example. Hold it again to return. The two displays work differently. The alternative meter also uses an exercise allowance for pressure loss. We'll use the UniFlo for the pressure comparison.
05:01 · Prepayment and the meter’s internal shut-off valve
There's another way for this meter to interrupt the supply. Open the UniFlo valve exercise. The balance screen starts at £5 of training credit. Select the £0 action and watch the last penny come into view.
This example assumes there is no emergency credit left and the friendly credit period has ended. As the balance reaches zero, the meter drives its internal valve shut. The busy indication appears while it moves. Once shut, the display shows its closed position. Check the red handle outside. It hasn't moved.
Adding £5 restores credit. The meter still has to reconnect. Follow the appliance and connection prompts. Watch the valve partly open while the meter checks for flow.
Try the excess flow option during that check and watch the valve return to shut. A successful check allows it to open fully. If the meter repeatedly fails to reopen despite available credit, contact the gas supplier about a possible meter fault.
06:12 · Standing and working pressure
Now follow the outlet pipe past the tee. One branch goes to the cooker on the right wall. The other continues to the boiler. Long press the yellow boiler valve to start the U-gauge.
First the hose is at the meter outlet and the appliances have no gas demand. Read the height difference between the two liquid surfaces. They move in opposite directions. Read their total separation on the instrument's scale.
The reading here is standing pressure. The room assumes no extra rise when the governor locks up. Here the governor is set to 22 mbar. With sufficient supply, the meter outlet also reads twenty two before the boiler fires. A real regulator's settled no-flow pressure is measured in its own right.
Watch the hot tap and the boiler status. The demonstration switches the boiler on and opens the tap to request hot water. Once the flame is proved and gas is flowing, the instrument at the meter shows working pressure. A running tap alone doesn't prove ignition.
07:26 · Boiler demand at part and full load
Why does the reading change? Gas flowing through the meter meets resistance. In the UniFlo example, the room estimates that loss from the published natural gas curve for the underlying measuring unit. The precise extra resistance of the integral valve is unknown. That makes it an estimate for this meter.
The 25 kW exercise increases the hot water flow from 5.6 to 10.2 L/min. The target stays at 45°C. For the 25 kW combi example, the full hot water demand uses 2.63 m³/h. The 30 kW example uses 3.14.
Now the hose moves to the inlet below the boiler. Keep the boiler at the same load while you compare both locations. This short run of 22 mm copper includes bends, a tee and a rise. Its pressure change depends on the flow and the route between the two test points.
One millibar is the external pipework allowance in the Worcester example. The model calculates the change for the actual run. The gauge rounds to a tenth, so two nearby readings can appear the same.
08:48 · Boiler and cooker running together
Turn towards the cooker. A household can be heating water while somebody's cooking. With the boiler at full hot water load, select Test with cooker. Both rear burners light. The front burners and oven stay off.
This illustrates the high operating load used in the domestic supply pressure guidance. The largest appliance runs at maximum. Other appliances run at half load. For a four burner hob, the guidance gives the example of lighting two burners. Here each of the two rear burners is rated at two kilowatts.
The room estimates their combined gas use at about 0.4 m³/h. Add that to the 25 kW boiler example and roughly 3.03 m³/h passes through the meter. The shared pipe carries this combined flow. Only the boiler's share continues past the tee towards its inlet.
End the cooker test. Its flames go out while the boiler can keep firing.
09:57 · Internal gas valve inlet
At the end of a full-load boiler comparison, with the cooker test finished, select the internal gas valve test. The animation isolates the boiler while its front opens. Follow the hose as it moves inside.
The internal valve inlet is downstream of our last reading. An internal pipe and gas cock lie between the two points. The room restores the same firing rate and waits for a proven flame.
The exercise estimates the intervening loss using data for a comparable valve. Worcester's Greenstar 4000 example allows up to 1.5 mbar across this internal section at full load. That allowance is a limit. The reading in the animation is an estimate for the selected flow.
Worcester's revised example starts at 18.5 mbar at the meter under load. With the full external allowance of 1 mbar, that gives 17.5 at the appliance inlet. Use the applicable appliance instructions for the exact location and limit. 17.5 is no universal legal minimum for every boiler test point.
11:15 · Reporting a pressure issue
The meter outlet reading tells you what pressure the installation was receiving. Comparing the boiler inlet at the same firing rate lets you examine the external pipework. The internal test helps locate a further change inside the appliance.
For the domestic supply check in Great Britain, use the high operating load and allow one minute for the pressure to stabilise. The guidance gives a meter outlet working range of 18.5 to 23 mbar, inclusive. A value below or above that range calls for the reporting procedure.
A low standing setting on the yellow pipe gives you access to the reporting rehearsal. It asks for a separate loaded reading. Give the location, a callback number, the test point and the conditions. In Great Britain, call the National Gas Emergency Service on 0800 111 999. Record the reference you're given. This rehearsal places no call.
12:22 · Recap and closing
When you record a pressure, name the test point and the appliances drawing gas.
Room 85 is in development. Download the HxAR app to explore the available training rooms.
Find a boiler, open Boiler Help, and choose a tutorial. You can repeat the exercises at your own pace.
Subscribe to our YouTube channels to follow the next boiler tutorials as they're released.
You'll find more from us on the EPHG website. Thanks for watching.